Skip to content
MCManufacture Contracting

Low volume & prototype

Small-Batch CNC Machining

Between the one-off and the production run sits the batch: ten to a few hundred pieces, repeating a few times a year. This is where quoting gets interesting, because setup cost spreads across the batch and material buying starts to matter.

When this applies

  • Quantities in the tens or low hundreds
  • Repeat orders on a predictable cycle
  • A product in early commercial production
  • Spares batches for internal equipment

Ask for price breaks, not one number

Request pricing at several quantities — for example 10, 25, 50 and 100. The shape of that curve tells you where setup stops dominating and whether a larger batch genuinely saves money after you account for holding stock.

Blanket orders and scheduled releases

If usage is predictable, a blanket order with scheduled releases gives you batch pricing without batch inventory. The shop can buy material once and run efficiently; you take delivery as needed. Mention it in the enquiry if your usage supports it.

  • Agree total quantity and release schedule up front
  • Confirm how long the price is held
  • Clarify storage responsibility between releases

Inspection scope

Decide what inspection you actually need before quoting: a first-article report plus sampling is standard, full dimensional inspection of every piece is not, and the difference is significant on a batch of a hundred.

RFQ checklist

Include these in your request and suppliers can quote without a round of questions.

  • Model or drawing with revision number
  • Quantities you want priced (a ladder, not one figure)
  • Annual usage and reorder pattern
  • Inspection and documentation requirements
  • Packaging and delivery destination
Submit a Manufacturing Project

Tell us what you need made.

Describe your part, assembly or product and we'll help you find manufacturers with the right processes, capabilities, certifications and location.